Supply Chain & Logistics

72,500 Sq. Ft. Warehouse — Supply Chain & Logistics

CIPL II, MIDC Phase 3, Pune 410501

Multi-bay loading dock with dock levellers at the CIPL II warehouse facility in Chakan MIDC Phase 3

Requirement

A supply chain and logistics operator required a large-format warehouse in Chakan MIDC Phase 3 with efficient truck circulation and dock access to serve the Chakan-Pune distribution network.

Solution

CIPL developed a 72,500 sq. ft. warehouse in MIDC Phase 3, designed for logistics throughput and leased directly on a long-term basis.

Facility

  • 72,500 sq. ft. built-up warehouse
  • Layout planned for pallet storage and cross-dock movement
  • Truck-friendly internal circulation and yard space
  • Location within Chakan MIDC Phase 3, close to the Chakan-Talegaon road network

Outcome

The warehouse has been in continuous use for supply chain and logistics operations since handover.

Facility Snapshot

Built-up Area
72,500 sq. ft.
Industry
Supply Chain & Logistics
Location
CIPL II, MIDC Phase 3, Pune 410501

Have a similar requirement in Chakan MIDC?

CallWhatsAppEnquire