Automotive Manufacturing — Casting & Sub-Assemblies

35,000 Sq. Ft. Industrial Shed — Automotive Manufacturing

CIPL III, MIDC Phase 1, Mahalunge, Pune 410501

Exterior elevation of the CIPL III automotive manufacturing facility in Mahalunge, Chakan MIDC Phase 1

Requirement

An automotive component manufacturer producing castings and sub-assemblies required a mid-size industrial shed suited to precision manufacturing near Pune's automotive OEM base.

Solution

CIPL developed a 35,000 sq. ft. industrial shed in MIDC Phase 1, Mahalunge, and leased it directly to the occupier for casting and sub-assembly production.

Facility

  • 35,000 sq. ft. built-up industrial shed
  • Shop floor laid out for casting and sub-assembly lines
  • Located within the Mahalunge automotive supply chain cluster

Outcome

The facility has been operating as an automotive casting and sub-assembly unit since handover.

Facility Photographs

Precision manufacturing shop floor with CNC machines and quality control area inside the CIPL III facility
Sub-assembly line bay with workers assembling components at the CIPL III facility
Finishing area with mezzanine platform inside the CIPL III facility

Facility Snapshot

Built-up Area
35,000 sq. ft.
Industry
Automotive Manufacturing — Casting & Sub-Assemblies
Location
CIPL III, MIDC Phase 1, Mahalunge, Pune 410501